<body><script type="text/javascript"> function setAttributeOnload(object, attribute, val) { if(window.addEventListener) { window.addEventListener('load', function(){ object[attribute] = val; }, false); } else { window.attachEvent('onload', function(){ object[attribute] = val; }); } } </script> <div id="navbar-iframe-container"></div> <script type="text/javascript" src="https://apis.google.com/js/platform.js"></script> <script type="text/javascript"> gapi.load("gapi.iframes:gapi.iframes.style.bubble", function() { if (gapi.iframes && gapi.iframes.getContext) { gapi.iframes.getContext().openChild({ url: 'https://www.blogger.com/navbar/8947368?origin\x3dhttp://southbrucepeninsula.blogspot.com', where: document.getElementById("navbar-iframe-container"), id: "navbar-iframe" }); } }); </script>

Tuesday, May 06, 2008

Public Notice Amabel Sauble Water Treatment Plant

PUBLIC NOTICE

CONSTRUCTION OF AMABEL SAUBLE WATER TREATMENT PLANT
AND
TRUNK WATERMAINS
SAUBLE BEACH
TOW N OF SOUTH BRUCE PENINSULA


From May, 2008 onwards, the new Amabel Sauble W ater Treatment Plant w ill be constructed at the Amabel
Sauble School location. Additionally, watermains will be constructed along the following streets/roads:

· Sauble Falls Parkway
· W oodland Crescent
· 6 th Stree t North
· 3 rd Avenue North
· 9 th Stree t North
· 2 nd Avenue North
· D-Line
· Jewel Bridge Road
· Deer Trail Road
· Martin Drive

The proposed watermains will connect the seven (7) existing small water systems (Gremik, Thomson, Trask,
Forbes , W inburk, Fedy and R obins).

Please note that no connections to the new watermain will be permitted at this time. W ater service
connections are only available to those currently on municipal water service.

W ate rm ain construction is anticipated to be completed by end of October 2008 and the W ater Treatment Plant
building is anticipated to be com m issioned in Ma rch 200 9. Du ring cons truction of th e wa term ain, the prop erty
owners along the above referenced locations ma y experience som e inconvenience , however, all effo rts shall
be m ade to m inim ize it. W e request your co-operation and patience for the successful completion of these
projects.

If you have any questions or concerns regarding the construction, please contact the undersigned.

Iss ued by:


Brad McRoberts, Manager of Public W orks
Tow n of South B ruce Peninsula
Box 310
315 George Street
W iarton, ON
N0H 2T0
Tel: 519-534-1400

0 Comments:

Post a Comment

<< Home